What is Project Risk Management?
Project risk management, told as a story about an umbrella you always carry, just in case it rains on show day.
Rain pours down on show day, with nothing prepared.Even a perfect checklist always leaves show-day surprises like the weather.
If trouble never comes, preparing looks wasteful — if it does come, it's too late to start.The risk you can't see is the scary one — once it hits, it's too late to prepare.
Like an umbrella you always bring even if unused, risk management prepares a response before trouble hits.The day you never open the umbrella is the best day.
A different strategy fits each risk.Big risks get avoided, transferred, or reduced — small ones may simply be accepted.
Carrying the umbrella doesn't stop the rain.Risk management isn't erasing the risk — it's leaving room to respond.
Project risk management = finding things that may or may not happen — like show-day weather — and leaving room to respond to them.
Project risk management identifies risks, analyzes them by probability and impact, chooses a response such as avoid, transfer, mitigate, or accept, and monitors them throughout the project. The PMBOK Guide 6th edition also lists escalate, for threats beyond the project's authority. The goal isn't zero risk; it's keeping risk at a manageable level.
When grown-ups say it
- Risk Identification
- Thinking of the chance it might rain. Lists come from brainstorming and checklists.
- Risk Analysis
- Gauging the odds of rain and how bad it'd be. Ranked by probability × impact.
- Avoid
- The strategy of canceling the outdoor show entirely. The risk goes away, but so does what the outdoor show would have gained.
- Transfer
- Shifting risk via insurance or outsourcing. The risk itself doesn't disappear.
- Mitigate
- Pitching a tent to shrink the damage. It can't remove the risk, but it shrinks the damage.
- Accept
- Just carrying small risks as they are. Used when the fix would cost more than the risk itself.
- WBS
- The checklist that breaks show prep into pieces. Risk hides inside each item of this checklist. → the checklist that breaks down show prep
- BCP
- The plan that keeps the show going even through a blackout-sized disaster. Preparation for even bigger (disaster-scale) risk. → the tour that carries on through a blackout